Non-motorized and Intersection Improvements 

A number of Snohomish County projects will make it easier for people to get around their neighborhood, and to schools, shopping areas and other neighborhoods.The plans include building and repairing sidewalks, widening road shoulders for walking and bicycling; upgrading ADA ramps; and installing crosswalks, traffic signals, and pedestrian-operated beacons.

Funding
There are two dedicated funding sources for the projects: 

  • LIP - Local Infrastructure Project Bonds
  • SKIP (Safe Kids, Improved Pathways) - Road Levy Taxes
SKIP Projects
View a list and more details about our SKIP projects.

LIP Projects - Underway/Planned
 Location  Description  Est. Const.
3rd Ave SE - 130th St SE Sidewalk 2015
39th Ave SE Sidewalk from 220th St SE to 221st Pl SE 2015
84th St NE/115th Ave NE Intersection improvement TBD / awaiting funding
Elgin Way  Sidewalk  2015 
Jefferson Elem School 
Sidewalk along Cadet Way 2015
Manor Way Phase 1: Interim 5' shoulder on west side to connect 164th St SW to 156th St SW; Phase 2: Ultimate road section design (two-way left turn, bike lanes, sidewalk) Phase 1: Summer/Fall 2015
Mariner High School  Sidewalk on Meridian Ave S 2015
North Creek Trail  Design and build trail  TBD / awaiting funding 

LIP Projects - Completed
 Location  Description  Status
35th Ave SE Pedestrian improvements Complete 
51st Ave SE Sidewalk near Seattle Hill Elem Complete
Bev Park Rd & Gibson Rd Traffic Signal Complete
Cathcart Way & Puget Park Dr Traffic Signal Complete
Centennial Middle School Pathway plus flashing beacon on S. Machias Rd. See photo of the new pathway here. Complete
Cougar Creek Elem School
Dynamic Speed Signs on 11th Ave NE Complete
Discovery Elem School School Crossing Upgrade on Meridian Ave S Complete 
Fairmont Elem School Dynamic speed signs on Bev-Park Rd Complete 
Jefferson Elem. School Flashing beacon & asphalt pad Complete
Maltby Elem School Shoulder improvements to 99th Ave SE Complete
Olivia Park Elem School Walkway on 108th St SW Complete 
Picnic Pt Elem School Curb ramp replacements at 60th Ave W/140th St SW and two school driveways Complete 
Tulalip Schools  Dynamic speed signs on 27th Ave NE  Complete 
Voyager Middle School Dynamic speed signs on 4th Ave W Complete