Final Environmental Impact Statement (FEIS)

The county issued a FEIS on December 12, 2013, to analyze the environmental impacts of the proposal.

  • Postcard Notice (PDF)
  • Sign Posted on the Site (PDF)
  • Notice of Availability (PDF) - Everett Herald Publication
  • FEIS Parts
    • Full FEIS (PDF)
    • Appendix A (PDF): Snohomish County Council Resolution No. 05-026
    • Appendix B (PDF): Agricultural Advisory Board Recommendation
    • Appendix C (PDF): Salmon Productivity Calculations for Smith Island Restoration Project
    • Appendix D (PDF): Current and Future Bird Use of the Project Area
    • Appendix E (PDF): Current and Future Wildlife Use of the Project Area
    • Appendix F (PDF): FEIS Distribution List
    • Appendix G (PDF): Draft Environmental Impact Statement (DEIS) Comment Letters and County’s Responses
    • Appendix H (PDF): SNR Company Review of Smith Island Estuary Restoration Project – Tasks 1-4 Report – and Snohomish County Responses to their Comments
    • Appendix I (PDF): Snohomish County Smith Island Drainage Analysis, May 2013
    • Appendix J (PDF): Snohomish County Smith Island Estuarine Restoration Union Slough Hydraulic Model Study, May 2013
    • Appendix K (PDF): Snohomish County Smith Island Estuarine Restoration Saltwater Impact Study, May 2013
    • Appendix L (PDF): Snohomish County Smith Island Estuary Restoration Interior Drainage Report Preliminary 60 Percent Design, November 2013
    • Appendix M (PDF): Preliminary Haul Route Recommendation for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
    • Appendix N (PDF): Preliminary Setback Levee Erosion Protection Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 10, 2013
    • Appendix O (PDF): Preliminary Levee Breach and Ditch Fill Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
    • Appendix P (PDF): Final Geotechnical Engineering Report for Snohomish County Smith Island Estuary Restoration Project, March 25, 2015

Additional Documents