Final Environmental Impact Statement (FEIS)
The county issued a FEIS on December 12, 2013, to analyze the environmental impacts of the proposal.
- Postcard Notice (PDF)
- Sign Posted on the Site (PDF)
- Notice of Availability (PDF) - Everett Herald Publication
- FEIS Parts
- Full FEIS (PDF)
- Appendix A (PDF): Snohomish County Council Resolution No. 05-026
- Appendix B (PDF): Agricultural Advisory Board Recommendation
- Appendix C (PDF): Salmon Productivity Calculations for Smith Island Restoration Project
- Appendix D (PDF): Current and Future Bird Use of the Project Area
- Appendix E (PDF): Current and Future Wildlife Use of the Project Area
- Appendix F (PDF): FEIS Distribution List
- Appendix G (PDF): Draft Environmental Impact Statement (DEIS) Comment Letters and County’s Responses
- Appendix H (PDF): SNR Company Review of Smith Island Estuary Restoration Project – Tasks 1-4 Report – and Snohomish County Responses to their Comments
- Appendix I (PDF): Snohomish County Smith Island Drainage Analysis, May 2013
- Appendix J (PDF): Snohomish County Smith Island Estuarine Restoration Union Slough Hydraulic Model Study, May 2013
- Appendix K (PDF): Snohomish County Smith Island Estuarine Restoration Saltwater Impact Study, May 2013
- Appendix L (PDF): Snohomish County Smith Island Estuary Restoration Interior Drainage Report Preliminary 60 Percent Design, November 2013
- Appendix M (PDF): Preliminary Haul Route Recommendation for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
- Appendix N (PDF): Preliminary Setback Levee Erosion Protection Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 10, 2013
- Appendix O (PDF): Preliminary Levee Breach and Ditch Fill Recommendations for Snohomish County Smith Island Estuary Restoration Project, October 4, 2013
- Appendix P (PDF): Final Geotechnical Engineering Report for Snohomish County Smith Island Estuary Restoration Project, March 25, 2015
Additional Documents
- Channel Migration and Scour Evaluation, Everett Delta Natural Gas Pipeline / Smith Island Restoration (PDF) Prepared for CH2M Hill by West Consulting, 2007
- Dike Crossing at Williams Pipeline Settlement Analysis (PDF) - May 21, 2007 - CH2M Hill Memo, 2007
- Puget Sound Action Agenda
- Puget Sound Salmon Recovery Plan
- Smith Island Wetland Characterization (PDF) - Snohomish County Public Works, May 2008
- Snohomish Basin Salmon Recovery Forum Board Presentation (PDF) (August 1, 2013)
- Snohomish River Basin Salmon Conservation Plan (PDF)
- Snohomish River Basin Three-Year Work Plan (PDF)