192nd St & Waxen Rd

Description - Completed 2016

This drainage improvement project entailed installation of 131 lineal feet of 18-inch pipe, 235 lineal feet of 24-inch pipe and four catch basins to re-route a stormwater conveyance system to the south side of 192nd Street SE, allowing the storm system to drain effectively and alleviate road flooding.


Schedule

Construction was completed in 2016 by Snohomish County Road Maintenance crew.