To support Community Transit's proposed Swift Bus Rapid Transit Green Line, Public Works is proposing pedestrian facility improvements at the following locations:
Public Works will be upgrading existing curb ramps to current standards and installing Accessible Pedestrian Signals (APS) at the intersection of Beverly Park Road and 112th Street SW in the Everett area.
Construction is expected to occur in Spring/Summer 2019.
Public Works is adding new sidewalk on the east and west side of Center Rd from Alexander Rd to Marino Ave. The sidewalk will continue north on the both sides of Marino Ave from Center Rd to the back entrance of Fairmont Elementary School. The intersection of Center Rd and Marino Ave will be reconfigured to improve safety and mobility. A parking lane along the Marino Avenue stretch is also slated to be constructed. Approximately 2,500 lineal feet of sidewalk and 13 new curb ramps will be constructed. This project will improve pedestrian access to Community Transit’s Green Line transit stops as well as pedestrian access to Fairmont Elementary School.
Construction is expected to occur in Spring/Summer 2019.
The 4th Avenue W pedestrian facility improvements project includes a new sidewalk on the east side of 4th Avenue W from 134th Street SW to the south side of the Mariner Park and Ride entrance. Existing curb ramps will also be upgraded to current standards at the intersection of 4th Avenue W and 132nd Street SW.
Construction is expected to occur in Spring/Summer 2019.
Improvements in this area include a new sidewalk and bike lane on the east side of 10th Drive SE from Elgin Way to 129th Street SE and a new sidewalk along the south side of 129th Street SE from 10th Drive SE to 12th Drive SE.
Construction is expected to occur in Spring/Summer 2019.
Pedestrian improvements in the Bothell area include a separated walkway on the south side of 196th Street SE from State Route (SR) 527 to 23rd Drive SE. Improvements will also be made at 22nd Avenue SE, 23rd Drive SE and 24th Drive SE.
The design of the pedestrian facilities is funded through Snohomish County's Road Fund.
These projects are funded through a combination of a Federal Transit Administration (FTA) grant and the Snohomish County Road Fund.
To stay informed on these projects, sign up to receive email or text notifications when this webpage has been updated.
Sign up to receive an email notification when this project information is updated.
View additional road information.
Project #s:
Beverly Park Road: RC1715
Center Road: RC1716
4th Avenue W: RC1717
10th Drive SE: RC1718
196th Street SE: RC1719
Construction schedules are subject to change based on many factors that include: public safety; availability of funding, staffing, equipment and materials; right of way issues; permitting requirements; coordination with utilities and other agencies; soil conditions under roadway and seasonal changes.