Drainage Improvements Near 105th St SW

Project Description - Completed 2017

Snohomish County Surface Water Management replaced deteriorated stormwater pipes along 105th Street SW between 4th Avenue W and 3rd Avenue SE as well as Meridian Avenue S, south of 104th Street SE. The work consisted of replacing approximately 1245 feet of pipe, 5 catch basins, a driveway culvert located at 15 105th Street SE, and grading roadside ditches. All work was within road right of way or within easements adjacent to the roadway.


Schedule

This project was constructed late Spring/Summer of 2017.


Traffic

Signage and traffic control was provided to route traffic around the construction site.


Documents