Granite Falls Bridge #102 - Previous Funding Applications
The project design and right-of-way phases for Granite Falls Bridge #102 are fully funded by the County Road Fund. Snohomish County is actively seeking construction funds. See previous application submittals below for the following grants:
- 2020 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application (website)
- 2019 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application (website)
- 2018 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application (website)
- 2017 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant Application (website)
- 2016 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant (website)
- 2016 USDOT FASTLANE Grant (website)
- 2016 Washington State Freight Mobility Strategic Investment Board (FMSIB) Grant (website; pdf)
- 2015 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant (website)
2020 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application
- Cover Letter (PDF)
- Master Narrative (PDF)
- Benefit Cost Analysis (PDF)
- Project Schedule (PDF)
- Project Cost Estimate (PDF)
- Partnerships - Letters of Support (PDF)
- Type, Size, Location Study (PDF)
- 30% Design Plan Set (PDF)
- Referenced Maps (PDF)
- Right of Way Maps (PDF)
- Economic Redevelopment Plan Flyer (PDF), Link to Full Plan
- SEPA Checklist (PDF)
- Bridge Traffic (PDF)
- 2019 Annual Bridge Report, page 17 (PDF)
- Funding Commitment Letter (PDF)
2019 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application
- Cover Letter (PDF)
- Master Narrative (PDF)
- Benefit Cost Analysis (PDF)
- Project Schedule (PDF)
- Project Cost Estimate (PDF)
- Partnerships - Letters of Support (PDF)
- Type, Size, Location Study (PDF)
- 30% Design Plan Set (PDF)
- Referenced Maps (PDF)
- Right of Way Maps (PDF)
- Economic Redevelopment Plan Flyer (PDF), Link to Full Plan
- SEPA Checklist (PDF)
- Bridge Traffic (PDF)
- 2018 Annual Bridge Report, page 18 (PDF)
- Funding Commitment Letter (PDF)
2018 USDOT Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grants Application
- Cover Letter (PDF)
- Master Narrative (PDF)
- Benefit Cost Analysis (PDF)
- Project Schedule (PDF)
- Project Cost Estimate (PDF)
- Partnerships - Letters of Support (PDF)
- Type, Size, Location Study (PDF)
- 30% Design Plan Set (PDF)
- Referenced Maps (PDF)
- Right of Way Maps (PDF)
- Economic Redevelopment Plan Flyer (PDF), Link to Full Plan
- SEPA Checklist (PDF)
- Bridge Traffic (PDF)
- Federal Wage Rate Certification (PDF)
- 2017 Annual Bridge Report, page 18 (PDF)
2017 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant Application
- Cover Letter (PDF)
- Master Narrative (PDF)
- Benefit Cost Analysis - Part A (PDF)
- Benefit Cost Analysis - Part B (PDF)
- Project Schedule (PDF)
- Project Cost Estimate (PDF)
- Partnerships - Letters of Support (PDF)
- Type, Size, Location Study (PDF)
- 30% Design Plan Set (PDF)
- Referenced Maps (PDF)
- Right of Way Maps (PDF)
- Economic Redevelopment Plan Flyer (PDF), Link to Full Plan (PDF)
- SEPA Checklist (PDF)
- Bridge Traffic (PDF)
- Federal Wage Rate Certification (PDF)
- 2016 Annual Bridge Report (PDF)
2016 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant Application (April 2016)
- Cover Letter (PDF)
- Master Narrative (PDF)
- Maps (PDF)
- Federal Wage Rate Certification (PDF)
- Benefit Cost Analysis (PDF)
- Project Schedule (PDF)
- Project Preliminary Cost Estimate (PDF)
- Partnerships - Letters of Support (PDF)
- Bridge Traffic (PDF)
- GFAR Traffic (PDF)
- SEPA Checklist (PDF)
- Type, Size and Location Study (PDF)
- 30% Design Plan Set (PDF)
- 2014 Annual Bridge Report (PDF)
2016 USDOT FASTLANE Grant Application (April 2016)
- Cover and Cover Letter (PDF)
- Table of Contents and Narrative (PDF)
- Maps (PDF)
- Project Schedule (PDF)
- Project Budget (PDF)
- Partnerships - Letters of Support (PDF)
- Traffic Data (PDF)
- Benefit Cost Analysis (PDF)
- Cover Chart (PDF)
- SEPA Checklist (PDF)
- Type, Size and Location Study (PDF)
- 30% Design Plan Set (PDF)
- 2014 Annual Bridge Report (PDF)
2016 Washington State Freight Mobility Strategic Investment Board (FMSIB) Grant Application (March 2016)
2015 USDOT Transportation Investment Generating Economic Recovery (TIGER) Grant Application (June 2015)
- Cover Letter (PDF)
- Master Narrative (PDF)
- Federal Wage Rate Certification (PDF)
- Benefit Cost Analysis, Part A (PDF) (Section F)
- Benefit Cost Analysis, Part B (PDF) (Section F)
- Project Schedule (PDF) (Section G-3)
- Partnerships - Letters of Support (PDF) (Section E-7)
- Type, Size and Location Study (PDF)
- 30% Design Plan Set (PDF)
- 2014 Annual Bridge Report (PDF)
Contact Us
-
Max Phan
Engineering Manager
Program Planning & Env. Services
Ph: 425-388-3109
-
Snohomish County Public Works
3000 Rockefeller Ave., M/S 607
Everett, WA 98201