Description - Completed 2019
This project installed a 12-inch diameter culvert under Norma Beach road to provide an outlet for drainage system on the north side and route stormwater runoff to the existing drainage system on the south side of the road.
Schedule
Construction was completed in 2019 by Snohomish County Road Maintenance crew.
Funding
This project was identified through the Surface Water Management drainage complaint and investigation program and funded by Surface Water Management UGA revenues.
Documents