Project Description
The campground consists of a total of 30 sites within three loops. Other amenities include a dump station, restroom with ADA-showers, timber-framed picnic shelter with fireplace, and a short nature trail. Phase 2 is the addition of 12 non-utility campsites (with shared water) and shower-equipped restrooms at Whitehorse Park campground. Construction started summer of 2022 and was completed spring 2023.